Overview:
- Working with the fume hoods with consideration for future use.
This project involved disconnecting the existing fume hoods and cap the MEP connections for future use. This included demolition & decommissioning of 48 lab fume hoods on the 2nd floor with the intention of reconnecting them at a future date.